Loading content...
Loading content...
Screen a China drive unit for AMR or AGV sourcing risk before a prototype, pilot, or production purchase order.
The tool gives a first-pass decision. The report below explains which evidence changes the decision, what remains uncertain, and where AMR integrators should stop before ordering.
| Evidence | Why it matters | Stop signal |
|---|---|---|
| Torque-speed and thermal derating curves | Confirms continuous duty beyond brochure peak torque. | Only peak torque or short-duration data is provided. |
| Brake, encoder, and firmware release history | Reduces integration surprises during fleet debugging. | Firmware changes are undocumented or locked by reseller. |
| EMC, ingress, vibration, and safety-function scope | Separates component claims from vehicle-level validation. | Certificate does not match exact model or firmware. |
| Magnet family and material-origin statement | Screens rare-earth export-control and traceability risk. | Supplier will not disclose magnet composition. |
| HTSUS, tariff, and forced-labor trace pack | Protects U.S. launch dates and landed-cost assumptions. | Importer cannot support CBP evidence requests. |
| Profile | Good fit | Main risk | Commercial rule |
|---|---|---|---|
| Export-focused manufacturer | Pilot or controlled scale program. | Higher quote, but stronger evidence pack. | Shortlist if test scope matches exact SKU. |
| Factory-direct supplier | Prototype and cost discovery. | Documentation can trail product changes. | Use with sample audit and firmware freeze. |
| White-label trading company | Spot replacement only when source is known. | Traceability, warranty, and firmware ownership. | Reject for scale unless OEM chain is disclosed. |
| Scenario | Decision | Minimum next step |
|---|---|---|
| 800 units/year, pilot fleet, export-focused supplier, full test reports | Proceed to engineering validation. | Sample test against duty cycle and controller stack. |
| Scale order, U.S. market, unknown BOM traceability | Hold commercial purchase order. | Resolve HTSUS, UFLPA, magnet, and supplier-chain evidence. |
| EU deployment with STO/SLS claims and datasheet-only evidence | Treat safety claim as unproven. | Request IEC 61800-5-2 evidence and vehicle-level validation plan. |
| Outdoor AMR with custom protocol and no local spare plan | High operational risk. | Add local service stock, firmware access, and ingress test evidence. |
| Ref | Source | Date | Used for | Link |
|---|---|---|---|---|
| C1 | MOFCOM Announcement No. 18 of 2025 | Published 2025-04-04 | accessed July 29, 2026 | Rare earth export-control screen for Dy/Tb and high-temperature NdFeB magnets. | Open |
| C2 | Federal Register product exclusion extensions, 90 FR 55232 | Published 2025-12-01 | accessed July 29, 2026 | Section 301 exclusion timing and HTSUS scope caution for China-origin goods. | Open |
| C3 | Federal Register Section 301 four-year review modification | Published 2024-09-18 | accessed July 29, 2026 | Tariff exposure and alternate-sourcing pressure as commercial risks. | Open |
| C4 | CBP Forced Labor Enforcement Operational Guidance for Importers | Published 2026-06-30 | accessed July 29, 2026 | Forced-labor and UFLPA traceability requirements for U.S. import readiness. | Open |
| C5 | ISO 3691-4:2023 | Published 2023-06 | accessed July 29, 2026 | Driverless industrial truck safety and verification baseline. | Open |
| C6 | IEC 61800-5-2:2016 | Published 2016 | accessed July 29, 2026 | Functional-safety boundary for adjustable speed drive systems. | Open |
| C7 | Regulation (EU) 2023/1230 on machinery | Current consolidated version 2026-05-29 | accessed July 29, 2026 | EU machinery documentation, responsible-operator, and CE-route context. | Open |
| C8 | USTR Section 301 second four-year review notice | Published 2026-05-06 | accessed July 29, 2026 | Current review context for China-origin supply-chain and tariff exposure. | Open |
Continue the sourcing decision with adjacent engineering checks that affect the final drive-unit award.
Use the checklist output to challenge quote, test, traceability, and safety assumptions before supplier award.
